Civil and site works (sitework in the US) takeoffs start on the site plan: the area to clear and dig, pavements and kerbs, and the stormwater and sewer pipe and pits under the ground. TrueScale™ measures each on the site and services plans at their own scale.

Start free trial 30 days, every feature, no card

What civil contractors measure, and why

  • Site clearing, pavement and footpaths as areas, because they are priced by the square metre.
  • Excavation and fill as volumes, from the area and the depth, because earthworks are priced by the cubic metre.
  • Stormwater and sewer pipe as runs, by size, and trenches as their own lengths, because pipe and trench are priced separately.
  • Pits and bollards as counts, and kerbs, line marking and retaining walls as lengths.

The Site and civil tool set

13 tools, from Tool Shed > Trade sets... > Site and civil:

ToolMeasuresStarter spec
Site clearingareaStrip topsoil 150 mm
Excavationvolume (area x depth)Bulk excavation, machine
Kerb lengthlengthBarrier kerb
Stormwater pitscount600 x 600 pit
BollardscountSteel bollard
Fill volumevolume (area x depth)Imported fill, compacted
Trench lengthlengthTrench 450 wide, 600 deep
Stormwater pipe runlengthStormwater pipe 150 dia
Sewer pipe runlengthSewer pipe 100 dia
Pavement areaareaAsphalt pavement 40 mm
Footpath areaareaConcrete footpath 100 mm
Line marking lengthlengthLine marking 100 wide
Retaining wall lengthwall area (run x height)Retaining wall

Worked example

Worked example: Kestrel Lane Townhouses

Sheet A0.03, the site and context plan, and A0.04, the site setout and services plan, both at 1:100.

MeasuredSheetQuantity
Site areaA0.031,104.93 m²
Site boundaryA0.03134.31 m
Common driveway, exposed aggregateA0.03192.72 m²
Stormwater pipe DN90 to the legal point of dischargeA0.0422.50 m
Stormwater pitsA0.043
Sewer branches DN100A0.0433.60 m
Sewer main DN150 in the rear easementA0.0429.80 m

The site area matches the 1,104.9 m² on the cover sheet's project data, which is a quick check that the sheet's scale is right before anything gets priced.

A fictional demo project, drawn to scale and measured in TrueScale.

Start free trial 30 days, every feature, no card

Common site and civil takeoff mistakes

  • Measuring pipe, pricing trench. Where services share a trench, one trench carries several pipes. Measure the trench with Trench length and each pipe with its own run.
  • Forgetting depth. Excavation and fill are volumes, and a site plan only gives the area. Take the depth from the levels or sections and type it on the volume tool.
  • Leaving out bulking. Dug soil takes up more room than it did in the ground. Allow for it in the rate.
  • Missing the main. On Kestrel Lane the sewer main runs along a 2.0 m easement at the rear. It is easy to price the branches to each townhouse and forget the main they join.

Site and civil takeoff questions

Can I measure an excavation volume from a site plan?

Yes. Trace the area with Excavation and type the depth. TrueScale shows the area and the volume, and the volume follows if you change the depth.

Can I measure pipe by diameter?

Yes. Stormwater pipe run and Sewer pipe run are separate tools. Make a copy of a tool for each diameter, such as DN90, DN100 and DN150, and each size gets its own total.

Does it work on site plans at 1:200 or 1:500?

Yes. Set the scale for the sheet once and every measurement on it uses that scale. Each sheet keeps its own.

Set and check the scale on a site plan