Concrete takeoff from PDF plans: slabs, edges and footings
Concrete takeoffs come down to areas, edges, volumes and items: slabs, edge forms, footings, edge beams, walls, piers, pads, stairs and joints. TrueScale™ measures each on the plans and the engineer's drawings, at their own scale.
Start free trial 30 days, every feature, no card
What concreters measure, and why
- Slabs as areas to the outside of the slab edge, because concrete, mesh and finishing are priced by the square metre.
- Slab edges as perimeters, because edge form is set and stripped by the metre.
- Footings, edge beams and walls as volumes or runs, because concrete is ordered by the cubic metre.
- Piers, pad footings, columns and stairs as counts, and sawn joints as lengths.
The Concrete tool set
12 tools, from Tool Shed > Trade sets... > Concrete:
| Tool | Measures | Starter spec |
|---|---|---|
| Slab on ground | area | 100 mm slab, mesh |
| Slab edge | perimeter | Edge form |
| Footing volume | volume (area x depth) | Strip footing 25 MPa |
| Piers | count | 450 dia pier |
| Columns | count | Column 400 x 400 |
| Suspended slab area | area | Suspended slab 200 mm |
| Edge beam length | length | Edge beam 300 x 450 |
| Pad footings | count | Pad footing 900 x 900 |
| Wall volume | length | Concrete wall 200 thick (wall area x thickness) |
| Stairs | count | Concrete stair flight |
| Mesh area | area | Reinforcing mesh |
| Joint length | length | Sawn control joint |
Worked example
Worked example: Kestrel Lane Townhouses
Sheet A2.01, the ground floor dimension plan at 1:50, for the three townhouse slabs; A0.03, the site plan at 1:100, for the driveway.
| Measured | Sheet | Quantity |
|---|---|---|
| Slab on ground, to the outside face of the external walls | A2.01 | 332.87 m² |
| Slab edge | A2.01 | 136.08 m |
| Ground floor rooms, for comparison | A2.01 | 297.00 m² |
| Common driveway, exposed aggregate | A0.03 | 192.72 m² |
Per townhouse that is 110.96 m² of slab and 45.36 m of edge form, garage included.
The general notes ask for concrete to AS 3600, N32 unless noted, with the slab and footings to the engineer's design, so thicknesses, edge beams and mesh come from the engineer's drawings, not the architectural plan.
A fictional demo project, drawn to scale and measured in TrueScale.
Start free trial 30 days, every feature, no card
Common concrete takeoff mistakes
- Measuring the slab from room areas. Room areas stop at the walls; the slab runs under them to the outside edge. Here the ground floor rooms add up to 297.00 m² and the slab is 332.87 m².
- Taking thickness from the wrong drawing. Architectural plans rarely show slab depth, edge beams or thickenings. The engineer's slab plan does.
- Forgetting set-downs and rebates. Garage and wet area set-downs change the formwork and the volume.
- Ordering the exact volume. Over-excavation, uneven ground and the pump line all use concrete. Allow for it in the order.
Standards and the NCC
Concrete structures follow AS 3600, and residential slabs and footings follow AS 2870, both called up by the NCC. The engineer's drawings set what is built.
Concrete takeoff questions
How do I work out concrete volume from a slab plan?
Trace the area with Footing volume or another volume tool and type the depth from the engineer's drawing. TrueScale multiplies the area by the depth and keeps the volume in step if the depth changes.
Can one outline give me the slab area and the edge length?
Yes. An area measured with Slab on ground shows its area, and the Markups List shows its outline length beside it. Slab edge is there when you want the edge as a total of its own.
Can I count piers and pad footings?
Yes. Piers, Pad footings and Columns are count tools, each with its own symbol.